EN388 Cut Levels A1–A9: Choosing by Task
Understand cut-resistant glove ratings and compare them against metalworking, glass handling, automotive and warehouse tasks.
Written and reviewed by Leo Wong Man Chon · Founder & CEO, iGift Industrial Gloves · 2026-08-14
What a cut level indicates
EN388 cut levels A1 to A9 (based on ISO 13997 testing) indicate how well a glove resists sharp objects. The rating is only one factor; construction, fit and working method also affect real-world protection.
Light packaging and assembly may suit A1–A2. Automotive repair, metal pressing and glass handling often need A3–A5. Heavy sheet metal, blades or recycling may require A6 or above.
Match the level to the task
Higher cut levels usually mean thicker, stiffer gloves that reduce dexterity. Match the level to a documented risk assessment and set clear wearing rules for high-risk tasks.
Where oil and grip matter as well, choose a nitrile-coated cut-resistant glove. For precision work, choose a thin PU-coated style.
Do not overlook fit and replacement
Loose gloves reduce control; tight gloves affect comfort and circulation. Set up size collection and a replacement schedule so protection is not lost as gloves wear out.
Industrial glove buying checklist
| Task and hazard | List sharp objects, oil, chemicals, heat and static risks for each process. |
|---|
| Protection level | Confirm the EN388 cut level, EN407 heat rating or EN374 chemical requirement. |
|---|
| Material and coating | Choose PU, nitrile or latex coating for grip, breathability, oil resistance and dexterity. |
|---|
| Sizing and timing | Collect the S–XXL size breakdown and allow the standard 3–15 working day lead time. |
|---|
Frequently asked questions
- What is the minimum order for industrial gloves?
- The minimum order is 10 pairs. Final pricing and production planning depend on the style, protection level, logo method and quantity.
- What information helps iGift recommend a suitable glove?
- Share the task, materials handled, expected quantity, required protection level, size breakdown and logo artwork so our team can compare styles, materials and timing.
- What is the standard lead time?
- The standard lead time is 3–15 working days, depending on the confirmed style, quantity, size availability and logo method.
Sources and further reading
Browse all guides